Services Background
 

 

What does this consist of?

Once the TanWare equipment is in place with all the utilities connected, the start-up and training phase begins. The start-up and training phase typically takes between a few days and a few weeks, depending on the size of the installation and the customer’s level of expertise. Incotec guides customers through the entire process and makes sure that customers can go to full-scale production immediately after start-up.

What is the process?

Start-up usually begins with a thorough check of all installed components. Our engineers verify that all original TanWare equipment, as well as third-party equipment upon which TanWare is dependent, has been installed properly and is ready to operate. This is followed by the parameterization of TanWare control units and software. We will make sure that the TanWare system is optimally configured for your factory environment and operates flawlessly.

What tests are made?

During the testing phase, we subject the TanWare installation to well-defined, rigorous test procedures, including multiple varied sequences and high-load stress tests. This way we can ensure that TanWare will operate reliably under varying production conditions.

What training is provided?

We train machine operators, supervisors and factory floor managers in the operation of the TanWare system and provide detailed operation manuals to your staff. Training commonly includes lessons in using our PC-based software. Training can be provided in English or German language (or other languages upon request).